  • Chongqing UBO Made Debut at CWIEME Berlin 2024

    Chongqing UBO Made Debut at CWIEME Berlin 2024


    2024-05-17 [ News ]


    Chongqing UBO Made Debut at CWIEME Berlin 2024 First-day Exhibition Witnesses Dozens of Corporate Inquiries   By Chongqing UBO team   Berlin, May 14, 2024-- World's largest professional exhibition CWIEME BERLIN 2024 (The Coil Winding, Insulation and Electrical Manufacturing Exhibition 2024) was grandly held From May 14 to 16 at Messe Berlin. Chongqing UBO Electrical Equipment Co., Ltd.(Chongqing UBO) made debut as a Chinese exhibitor in this event. On the first day of the exhibition, Chongqing UBO harvests dozens of potential cor......

    More

  • 2019 Spring Festival Rally

    2019 Spring Festival Rally


    2019-02-16 [ News ]


    UBO hold Spring Festival Rally in MengHu Hotel dated on 26th Jan 2019,we gathered together to sum up the past and look to the future and also to celebrate the new year coming, We wish UBO grow solid step by step ,and hope every member in UBO will do their best for keeping the faith of climb up the highest point.

    More

  • chongqing—hubei ,DC back to back network project-XD of Changzhou

    chongqing—hubei ,DC back to back network project-XD of Changzhou


    2017-09-27 [ Projects ]


    Hubei and Chongqing DC back-to-back network project based on the construction of Sichuan, Chongqing, Tibet, the load center and the base of the southwest of the synchronous power grid, the total transmission power of 5 million kilowatts, it's the highest voltage level,  largest capacity of the flexible DC transmission project all over the world

    More

  • Zha Lu Te - Qingzhou(±800KV UHVDC project)-Sepco

    Zha Lu Te - Qingzhou(±800KV UHVDC project)-Sepco


    2017-09-26 [ Projects ]


    Zha Lu Te - Qingzhou ± 800 kV HVDC project is the first UHV power transmission channel in eastern Inner Mongolia. The project is based on the territory of Inner Mongolia, Hebei, Tianjin and Shandong. It is located in Qingzhou City, Shandong Province. The total length of the line is 1233.8 kilometers, the transmission capacity is 10 million kilowatts, the project investment is expected to be 22.1 billion yuan. Built in 2017 put into operation.

    More

  • Shanghai miao-Linyi(±800KV UHVDC project)-Sepco

    Shanghai miao-Linyi(±800KV UHVDC project)-Sepco


    2017-09-26 [ Projects ]


    Shanghai miao-Linyi ± 800 kV UHV DC transmission voltage rating of ± 800 kV, the transmission scale of 1000 megawatts, the construction scale for the new single-sided bipolar ± 800 kV HVDC transmission line, a total length about 1239.4 km. Project starting point is Inner Mongolia Erdos Shanghai Miao converter station, the end is  Shandong Linyi converter station. via Mongolia, Shaanxi, Shanxi, Hebei, Shandong 5 provinces

    More