Projects

  • chongqing—hubei ,DC back to back network project-XD of Changzhou

    chongqing—hubei ,DC back to back network project-XD of Changzhou


    2017-09-27 [ Projects ]


    Hubei and Chongqing DC back-to-back network project based on the construction of Sichuan, Chongqing, Tibet, the load center and the base of the southwest of the synchronous power grid, the total transmission power of 5 million kilowatts, it's the highest voltage level,  largest capacity of the flexible DC transmission project all over the world

    More

  • Zha Lu Te - Qingzhou(±800KV UHVDC project)-Sepco

    Zha Lu Te - Qingzhou(±800KV UHVDC project)-Sepco


    2017-09-26 [ Projects ]


    Zha Lu Te - Qingzhou ± 800 kV HVDC project is the first UHV power transmission channel in eastern Inner Mongolia. The project is based on the territory of Inner Mongolia, Hebei, Tianjin and Shandong. It is located in Qingzhou City, Shandong Province. The total length of the line is 1233.8 kilometers, the transmission capacity is 10 million kilowatts, the project investment is expected to be 22.1 billion yuan. Built in 2017 put into operation.

    More

  • Shanghai miao-Linyi(±800KV UHVDC project)-Sepco

    Shanghai miao-Linyi(±800KV UHVDC project)-Sepco


    2017-09-26 [ Projects ]


    Shanghai miao-Linyi ± 800 kV UHV DC transmission voltage rating of ± 800 kV, the transmission scale of 1000 megawatts, the construction scale for the new single-sided bipolar ± 800 kV HVDC transmission line, a total length about 1239.4 km. Project starting point is Inner Mongolia Erdos Shanghai Miao converter station, the end is  Shandong Linyi converter station. via Mongolia, Shaanxi, Shanxi, Hebei, Shandong 5 provinces

    More

  • Ximeng - Taizhou(±800KV UHVDC project-XD of Xian& Sepco

    Ximeng - Taizhou(±800KV UHVDC project-XD of Xian& Sepco


    2017-09-26 [ Projects ]


    The project is the world's first 10 million kilowatts of UHV DC transmission project, but also the national air pollution control action plan "four cross four straight" special high-pressure project an important part of the plan is scheduled to put into operation in 2017. Engineering through Inner Mongolia, Hebei, Tianjin, Shandong, Jiangsu, a total length of 1620 km, about 254.1 km in our province, the project dynamic investment of 25.4 billion yuan.every year can send electricity 55 billion kwh to the province after put into operation......

    More

  • Northwest Yunnan - Guangdong( ±800KV UHVDC project)-TBEA of Shengyang

    Northwest Yunnan - Guangdong( ±800KV UHVDC project)-TBEA of Shengyang


    2017-09-26 [ Projects ]


    Northwest Yunnan to Guangdong UHV DC project is the implementation of the State Council air pollution control action plan of 12 key transmission channels, is also the State Council to ensure economic "steady growth" key projects, a total investment of about 22.2 billion yuan, plans to be delivered in 2017 Capacity, transmission capacity of 5 million kilowatts. The project west of Yunnan Province, Dali County Jianchuan County, via Yunnan, Guizhou, Guangxi, Guangdong provinces, 53 counties, east of Shenzhen City, Guangdong Province Baoan District, the line length of 1959 km, is the lon......

    More